Kanban is a pull‑based replenishment method in which a signal, typically a card or an empty container, authorizes production or delivery of a fixed quantity only after the next process step has used it. The number of cards in a loop caps the inventory between two steps, so stock cannot grow beyond what the loop allows.
Kanban comes from the Toyota Production System and is the operational tool of just‑in‑time. A typical loop connects a line‑side rack with a supermarket or a supplier: when a container is emptied, its card goes back upstream and triggers replenishment of exactly one container. Electronic kanban (e‑kanban) replaces physical cards with scans, but the logic stays the same. The basic sizing formula is:
- Number of cards = daily demand × replenishment lead time (days) × (1 + safety factor) ÷ container quantity
Kanban in practice
The card count is a parameter, not a constant. A line uses 400 units a day, a container holds 50 units, replenishment takes half a day and the safety factor is 20%: 400 × 0.5 × 1.2 ÷ 50 = 4.8, so the loop gets 5 cards. If the cards are collected from the line only every half day, the waiting time is part of the lead time too. Lead time grows to one day and the same loop needs 10 cards, without any change on the supplier side.
The second source of drift is demand. When a new product ramps up and consumption rises to 600 units a day, the loop needs 8 cards; with the original 5 it holds at most 250 units while the line uses 300 during a single replenishment cycle, and it runs dry. When demand drops to 250 units, 3 cards are enough and two full containers sit idle. Kanban works best for repetitive parts with fairly level consumption; for low‑volume, high‑variety items or volatile demand, planning from MRP tends to be the better fit.
Logio designs kanban loops, supermarkets and line feeding as part of intralogistics and material flow projects and tests card counts with dynamic simulation before they change on the shop floor. The demand figure behind the formula can come from Veritico STOCK, which forecasts demand per item, location and day.
Related terms
More supply chain insights

Supply chain glossary
Discrete Event Simulation
What discrete event simulation is, how it differs from a spreadsheet capacity calculation and why a single run or an uncut warm‑up period misleads.
11. november 2026
2 min

Supply chain glossary
Digital Twin
What a digital twin is, how it differs from a one‑off simulation model and why it has to replay a recorded week before its scenarios can be trusted.
10. november 2026
3 min

Whitepapers & ebooks
Promotion Cannibalization: How to Measure What One Promo Steals From the Rest
How to calculate what a promotion takes from substitutes in the same weeks, where the estimate breaks, and what it changes in the leaflet and in replenishment.
10. november 2026
11 min