Beverages

Designing a High‑Capacity Automated Warehouse for Czechia’s Top Brewer

Logio partnered with the client to design and oversee the construction of a fully automated warehouse to support significant production expansion.

Outcome

We delivered a turnkey high‑bay warehouse strategy, managing the transition from feasibility study to a fully operational facility with 42,000 pallet positions.

Pallet positions

0

About Plzeňský Prazdroj

Plzensky Prazdroj is a leading Czech brewery, producer of the original pilsner type beer Pilsner Urquell, headquartered in Plzen and owned by Asahi Group Holdings. It is the largest exporter of Czech beer, selling a broad portfolio of more than 50 beers and beverages from multiple brands to markets around the world.

Around 9 million hectolitres of beer produced at its breweries in 2019

Exports to nearly 50 countries worldwide

Approximate annual revenues of CZK 23 billion driven by domestic sales and growing export demand

Initial challenge

The brewery planned to expand production capacity, creating an urgent need to consolidate storage locations and significantly increase overall warehousing space.

Project goal

To identify the most cost‑effective storage concept and oversee the construction of a facility capable of handling increased volume with high efficiency.

Solution

From Feasibility Study to Fully Automated Reality

Logio managed the entire project lifecycle, comparing automation levels, selecting vendors, and supervising the construction of a state‑of‑the‑art facility.

01

Feasibility study

We analyzed various storage concepts and automation levels to build a solid business case and determine the optimal solution.

02

Vendor selection

We managed the tendering process to select the best technology providers for the automated warehouse.

03

Holistic integration

We ensured alignment across technology, IT, construction, fire safety, and operational processes, which are often overlooked.

04

Implementation supervision

We oversaw the installation and go‑live of the AS/RS technology to ensure operational readiness.

Solutions implemented

Prototyping and Feasibility

Technology Strategy & Optimization

Business & Vendor Evaluation

Operational Readiness & Go‑live

Technology Sourcing & Selection

Automated & Efficient Warehousing

Tendering & Supplier Management

Project Delivery Management

Business Case & Feasibility Study

Impact

A future‑proof logistics hub

Massive capacity increase

42,000 new pallet positions secured capacity for future growth.

Seamless connectivity

Production, storage, and dispatch linked via monorail and conveyors.

Full automation

Deployment of AS/RS stacker cranes minimized manual handling and optimized flow.

Simpler decisions

One source of truth replaces scattered tools.

Build a warehouse ready for the future

Whether you need a feasibility study or full implementation support, we ensure your infrastructure matches your ambition. Let’s discuss your automation strategy.

420

By submitting, you agree to our Privacy Policy and allow Logio to contact you.

We tackled many supply chain challenges

Distribution strategy scenarios for Plzeňský Prazdroj

Logio modelled the existing distribution network of Plzeňský Prazdroj and prepared several future distribution scenarios, each with a feasibility study and KPI impact assessment. This provided a fact based basis to choose a strategy that improves competitiveness and manages up to 80 percent of logistics costs while reducing the risk of multimillion crown mistakes.

Clear comparison of several future distribution strategy scenarios

Feasibility and KPI impact evaluated for each distribution option

Up to 80 percent of logistics costs addressed through the chosen distribution strategy

Show case study

Automated small‑parts warehouse for Volkswagen Slovakia

A new automated AKL at Volkswagen Slovakia provides high‑capacity storage and precise, software‑driven sequencing of KLT containers, supporting growing model complexity while keeping the project on time, on budget and more ecological.

170,000 KLT storage capacity in the new warehouse

1,320 KLT containers dispatched per hour in exact production sequence

88‑shuttle and elevator system

Show case study