Electrical & Lighting Equipment Manufacturing

Shorter lead times and simpler production

Logio partnered with Modus to redesign production planning and scheduling and to streamline semi‑finished inventory.

Outcome

Fewer production phases and a significantly reduced set of semi‑finished blanks improved flow and shortened order‑to‑delivery times.

Semi‑finished variants

-0%

Lead time reduced from

from 0 weeks

About Modus

Modus is a Czech manufacturer of professional luminaires, active since 1994 and among the country’s leading producers and exporters. Headquarters and sales are based in Jinočany near Prague, with production and technical support across the Czech Republic.

Founded: 1994

Scale: 25,000 luminaires produced per week

Team size: 250–499 employees (2023)

Initial challenge

Modus faced long delivery times and inefficient planning across a weekly output of approximately 25,000 products. Inventory of semi‑finished parts was complex and created waste in production.

Project goal

Increase information support for planning, reduce the number of production stages, and define a smaller set of semi‑finished items to stock in order to shorten end‑to‑end lead time.

Solution

Redesign production planning and scheduling

01

Process mapping and analysis 

of production and warehouse flows.

02

Process optimization

focused on planning and scheduling.

03

Data visibility and accessibility

to support decision making in production control.

04

Capacity planning

to stabilize schedules and align stages. KPI design and performance monitoring. 

Solutions implemented

Process Mapping & Analysis

Process Optimization

Data Visibility & Accessibility

Capacity Planning

KPI Design & Performance Monitoring

Impact

Simpler flow, faster delivery.

Slimmer semi‑finished portfolio

Reduced blanks from about 6,000 to 1,700, cutting complexity in planning and storage.

Fewer production phases

Simplified routing that reduces handovers and waiting.

Shorter end‑to‑end lead time

Faster order‑to‑handover through better scheduling and inventory setup.

Less waste in production

Fewer variants and clearer routings reduce rework and idle time.

Scalable method

The route‑modeling approach can be replicated across other Coop units and retail chains.

Let’s simplify your manufacturing flow

If your production planning is complex and lead times keep slipping, we can help you redesign planning, inventory of semi‑finished parts, and KPIs for faster throughput. Let’s talk.

420

By submitting, you agree to our Privacy Policy and allow Logio to contact you.

We tackled many supply chain challenges

Production planning optimization for Thermo King

Logio mapped and redesigned Thermo King’s production planning and material ordering processes, implemented changes in the information system and reporting, and set a clear action plan. This enables lower inventories, shorter lead times, and less workload for planners.

Improved efficiency of production planning

Reduced inventory levels in production supply

Shorter production lead times and smoother material flow

Show case study

LNG station network design for GasNet

Logio analysed freight flows through the Czech Republic and used distribution strategy modelling to position seven LNG stations so they can cover around 80 % of the territory and make low emission fuel significantly more accessible for carriers.

7 planned LNG filling stations in the initial network design

Up to roughly 80 % of Czech territory covered by the designed LNG infrastructure

Optimal placement of stations along the main long haul truck transit routes across the Czech Republic

Show case study