AL INVEST Břidličná, a.s. is one of the prominent aluminum processing companies in the Czech Republic. The company was struggling with a long delivery time of goods to their customers, therefore they decided to change the current production planning model.
PROCESS ANALYSIS
DEFINITION OF THE OPTIMAL INVENTORY LEVEL
Initially, we analyzed the current process of planning and conducted an analysis of technological methods and production data. Thanks to the advanced data analysis we identified suitable intermediate goods for the production. We then, based on the historical data and business plan, defined optimal stock levels and numbered the financial impacts of stock increase, with both working capital and inventory capacities.
The result was an increase of production flexibility thanks to the optimal setting of size and structure of the intermediate goods trays in production. The delivery time of chosen products was shortened by up to 3 weeks.
Reduced delivery time
for selected products
In order to provide you with the most enjoyable browsing experience, we use technologies such as cookies that store information about and/or access your device. Consenting to these technologies allows us to process data such as browsing behavior or unique IDs on this site. Failure to provide consent or withdrawal of consent may affect the operation of the site.